METHOD OF LAYING PRELIMINARILY BALLASTED PIPE LINE IN FLOODED SECTIONS

construction engineering; erection of underground pipe lines. SUBSTANCE: pipes are laid according to design axis of pipe line, after which they are welded in length, insulated, lines and ballasted with circular weight. Ground is dug by steps under lengths of pipes on either side in parallel with axi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: RUDAVETS I.M, GAPONENKO JU.I, KHOMICHENKO S.A, GNATUS' N.A, ANIKIN E.A, GASPARJANTS R.S, GABELAJA R.D, GLOVATSKIJ V.D, KOLIKOV V.L
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:construction engineering; erection of underground pipe lines. SUBSTANCE: pipes are laid according to design axis of pipe line, after which they are welded in length, insulated, lines and ballasted with circular weight. Ground is dug by steps under lengths of pipes on either side in parallel with axis, thus making pipe line sag to design mark. EFFECT: enhanced reliability. 2 cl, 2 dwg