OIL POOL DEVELOPMENT METHOD

oil and gas production. SUBSTANCE: when developing oil pool in the late development phase, working agent is injected through injection wells and product is taken out of productive wells. At least one productive well is shut off. Initially perforated intervals are insulated. From the depth level abov...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TJURIN V.V, KHASANOV JA.Z, KANDAUROVA G.F, NURMUKHAMETOV R.S, KHISAMOV R.S, KOLESNIKOV V.G, KHUSAINOV V.M, ANDRONOV S.N
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:oil and gas production. SUBSTANCE: when developing oil pool in the late development phase, working agent is injected through injection wells and product is taken out of productive wells. At least one productive well is shut off. Initially perforated intervals are insulated. From the depth level above upper perforation interval, new slant borehole is drilled, which can pass into of horizontal hole within productive formation. Horizontal or slant hole is led through the upper boundary of productive formation to the half distance between working wells. New bottomhole is placed at distance not less than 100 m from initial bottomhole. When producing oil through well, formation depression no higher than 1 MPa is maintained. EFFECT: increased oil pool recovery.