METHOD OF LAYING BURIED PIPELINES
A method for renovation of pipelines, comprising introduction of lining layers into the existing pipeline, the lining layers corresponding in length to the length of the pipeline to be renovated. The lining layers consist of fusible polymers and are presurized and fused together by the introduction...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method for renovation of pipelines, comprising introduction of lining layers into the existing pipeline, the lining layers corresponding in length to the length of the pipeline to be renovated. The lining layers consist of fusible polymers and are presurized and fused together by the introduction of a heat source into the inside of the innermost lining layer. |
---|