FREMGANGSMAATE OG INNRETNING FOR UTBYGNING AV EN VIRKSOM FORINGSVEGG-SIKRING AV HULROMSYSTEMER UNDER JORDEN

Welded grid structure for securing underground cavities such as mine roads, consisting of two sets or grid systems of parallel straight bars disposed in parallel planes and connected by welding to a third set of bars that extend perpendicular to the first two sets of bars. The bars of the third set...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MEITZEN, NANDOR, KMETY, ISTVAN, PASZTOR, REZSOE, KLAUSZ, ISTVAN, ASSZONYI, CSABA
Format: Patent
Sprache:nor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Welded grid structure for securing underground cavities such as mine roads, consisting of two sets or grid systems of parallel straight bars disposed in parallel planes and connected by welding to a third set of bars that extend perpendicular to the first two sets of bars. The bars of the third set are bent to enable them to intersect the planes of the first and second sets but not all intersection points are welded. The non-welded points are in accordance with a predetermined scheme as a result of which the grid system is rigid in the principal direction along the straight bars of the first two sets but is flexible along a direction perpendicular thereto. A process for making the grid structure is also disclosed.