Excavation construction method of high energy storage rock mass
The invention discloses an excavation construction method of high energy storage rock mass, comprising the following steps: S1. conducting groove excavation in the middle position of the to-be-excavated chamber to excavate a guide groove, wherein the rock masses on both sides of the guide groove are...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an excavation construction method of high energy storage rock mass, comprising the following steps: S1. conducting groove excavation in the middle position of the to-be-excavated chamber to excavate a guide groove, wherein the rock masses on both sides of the guide groove are used as protective layers, and the protective layers are positioned between the guide groove and surrounding rock; SZ. pre-anchoring the surrounding rock; S3. removing the protective layer by blasting method to obtain a chamber; S4. supporting the surrounding rock to finish the construction. The invention can reduce the damage probability of the surrounding rock and improve the engineering quality; by excavating a part of the guide groove and retaining the protective layer for a period of time, the excavation cost and the surrounding rock support cost are reduced; the construction workers don't have to expose to the surrounding rock after excavation for rushing to support, thus reducing the construction danger. |
---|