Operating method for the steel pipe press-fitting pile system

Provided is a method for operating a hydraulic steel pipe press-fit pile system based on a crane integrated. The method for operating the hydraulic steel pipe press-fit pile system based on the crane integrated of the present invention comprises: a step in which a construction target location is sel...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KIM, YONG MO, AHN, SEONG EUN, KIM, BONG KEUN, KIM, JIN GI
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Provided is a method for operating a hydraulic steel pipe press-fit pile system based on a crane integrated. The method for operating the hydraulic steel pipe press-fit pile system based on the crane integrated of the present invention comprises: a step in which a construction target location is selected; a step of transporting the steel pipe press-fit pile system to the selected construction target location; a step of installing the steel pipe press-fit pile system at the transported construction target location; and a step in which an installation process of a steel pipe press-fit pile is managed by a management unit. An objective of the present invention is to provide the method for operating the hydraulic steel pipe press-fit pile system based on the crane integrated, which reduces an axial force acting on a stake. 본 발명은 크레인 일체형을 기반으로 하는 유압식 강관 압입파일 시스템 운용방법에 있어서, 시공대상위치가 선정되는 단계; 선정된 상기 시공대상위치에 강관 압입파일 시스템이 이송되는 단계; 및 이송된 상기 시공대상위치에 강관 압입파일 시스템이 설치되는 단계를 포함하며, 상기 강관 압입파일의 설치과정이 관리유닛에 의하여 관리되는 단계를 포함하는 크레인 일체형을 기반으로 하는 유압식 강관 압입파일 시스템 운용방법를 제공한다.