Operating method for the steel pipe press-fitting pile system
Provided is a method for operating a hydraulic steel pipe press-fit pile system based on a crane integrated. The method for operating the hydraulic steel pipe press-fit pile system based on the crane integrated of the present invention comprises: a step in which a construction target location is sel...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; kor |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Provided is a method for operating a hydraulic steel pipe press-fit pile system based on a crane integrated. The method for operating the hydraulic steel pipe press-fit pile system based on the crane integrated of the present invention comprises: a step in which a construction target location is selected; a step of transporting the steel pipe press-fit pile system to the selected construction target location; a step of installing the steel pipe press-fit pile system at the transported construction target location; and a step in which an installation process of a steel pipe press-fit pile is managed by a management unit. An objective of the present invention is to provide the method for operating the hydraulic steel pipe press-fit pile system based on the crane integrated, which reduces an axial force acting on a stake.
본 발명은 크레인 일체형을 기반으로 하는 유압식 강관 압입파일 시스템 운용방법에 있어서, 시공대상위치가 선정되는 단계; 선정된 상기 시공대상위치에 강관 압입파일 시스템이 이송되는 단계; 및 이송된 상기 시공대상위치에 강관 압입파일 시스템이 설치되는 단계를 포함하며, 상기 강관 압입파일의 설치과정이 관리유닛에 의하여 관리되는 단계를 포함하는 크레인 일체형을 기반으로 하는 유압식 강관 압입파일 시스템 운용방법를 제공한다. |
---|