Method for maximum efficiency operation of a unit module using load estimation and power supplying device with maximum efficiency for the same

The present invention relates to a method for operating a plurality of modules connected parallel to a load to supply power to the load, wherein the method comprises the steps of: determining, by an integrated controller, which controls a first module among the plurality of modules, a rated power va...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: PARK HYUNSU, YU JAEWON
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present invention relates to a method for operating a plurality of modules connected parallel to a load to supply power to the load, wherein the method comprises the steps of: determining, by an integrated controller, which controls a first module among the plurality of modules, a rated power value of the load; calculating, by the integrated controller, the number of maximum efficiency operation modules, which need to be operated in a maximum efficiency mode, and the number of normal operation modules, which need to be operated in a normal operation mode, among the plurality of modules in order to supply power to the load by using the determined rated power value; selecting, by the integrated controller, as many modules as the calculated number of maximum efficiency operation modules and the calculated number of normal operation modules among the plurality of modules; transmitting, by the integrated controller, operation mode information and an operation command to slave controllers, which respectively control the selected modules; and controlling, by the integrated controller and the slave controllers, operations of respective corresponding modules by using the operation mode information transmitted thereto. According to the present invention, the maximum power point of a load of which the rating is unknown can be determined in a short time. 부하에 전원을 공급하도록 상기 부하에 병렬로 연결된 복수 개의 모듈들을 운전하는 방법으로서, 상기 복수 개의 모듈들 중 제1모듈을 제어하는 통합컨트롤러가, 상기 부하의 정격 전력값을 결정하는 단계, 상기 통합컨트롤러가, 상기 결정된 정격 전력값을 이용하여 상기 복수 개의 모듈들 중 상기 부하에 전원을 공급하기 위해 최대효율모드로 운전해야 하는 최대효율운전모듈의 개수, 및 일반운전모드로 운전해야 하는 일반운전모듈의 개수를 산출하는 단계, 상기 통합컨트롤러가, 상기 산출된 최대효율운전모듈의 개수, 및 상기 일반운전모듈의 개수만큼의 모듈들을 상기 복수 개의 모듈들 중에서 선택하는 단계, 상기 통합컨트롤러가, 상기 선택된 모듈들을 각각 제어하는 슬레이브 컨트롤러들에게 운전모드정보와 함께 운전 명령을 전달하는 단계; 및 상기 통합컨트롤러, 및 상기 슬레이브 컨트롤러들이 전달받은 상기 운전모드정보를 이용하여 각각 대응되는 모듈의 동작을 제어하는 단계를 포함한다.