CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE
Provided is a construction method for an underground structure, wherein a concrete enclosure is made into a segment, and assembled at the rear side of a shoe, thereby shortening the entire process. Furthermore, the concrete-enclosure is not propelled such that the propulsion of the shoe is sufficien...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; kor |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!