Method of construction electrical Room structures of consisting suction pile
The present invention relates to an installation method of an electric room structure including suction pile parts, which can more quickly, easily and completely dismantle a suction pile electric room structure, comprising the steps of: (s200) assembling an electric room structure on land; (s210) mo...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; kor |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The present invention relates to an installation method of an electric room structure including suction pile parts, which can more quickly, easily and completely dismantle a suction pile electric room structure, comprising the steps of: (s200) assembling an electric room structure on land; (s210) moving a suction pile electric structure to an installation place; and (s220) installing the suction pile electric structure on the water floor.
본 발명은 석션파일부 전기실구조물을 수상운송수단 또는 항공운송수단으로 설치장소로 이동한후, 석션파일부 전기실구조물을 물속지면에 보다 손쉽게 안정적으로 고정한후에 석션파일부의 상부면에 구비된 상부판에 전기실을 구비한 석션파일 전기실구조물을 다양한 지역의 물속지면에 신속하고 안정적으로 설치하여 사용하고 난 다음에 다시 석션파일 전기실구조물을 물속지면에서 보다 신속하고 용이하게 완전철거하도록한 석션파일부들로 구성된 전기실 구조물의 설치공법은; 상부에 중앙결합공(11)이 형성되고, 하부는 개방되며, 내부가 물속에 수용되는 공간부(12)를 형성한 버켓(10a)과, 상기 중앙결합공(11)과 연결설치된 입출부(13)가 설치되고, 상기 버켓(10a)의 상부면에 상기 공간부(12)에 물속의 유입 및 배출하도록 상기 버켓(10a)을 물속지반에 고정 및 이탈시키는 버켓펌프(14)가 설치되며, 상기 입출부(13)와 연결설치된 지지파일(15)로 구비된 석션파일부(16)와, 상기 지지파일(15)들의 상부에 상부판(17)을 고정설치하며, 상기 상부판(17)의 상부면에 전기실(18)을 구비하여 상기 석션파일부(16)들의 상부면에 설치조립하여 셕선파일 전기실구조물(100)을 육상에서 선조립되는 전기실구조물을 육상에서 조립하는 단계(s200)와; 상기 석션파일 전기구조물(100)을 인양선(a)과 연결된 바지선(b)에 선적하여 설치장소로 이동하는 석션파일 전기구조물을 설치장소로 이동하는 단계(s210)와; 상기 인양선(a) 및 바지선(b)에 의해 설치장소에 이동완료되면 상기 바지선(b)에 설치된 크레인(c)으로 셕선파일 전기실구조물(100)을 물속지면에 고정설치하는 석션파일 전기구조물을 물속지면에 설치하는 단계(s220)로 구성되는 것을 특징으로 한다. |
---|