process management method

The present invention relates to a process management method, as a method for managing the process of building a ship, comprising the steps of: collecting a connection relationship of unit operations for the ship; forming a plurality of operation paths from the overall process perspective by connect...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LEE DONG HA, SON SOOK YOUNG, HONG SOON IK, SONG MIN SEOK
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present invention relates to a process management method, as a method for managing the process of building a ship, comprising the steps of: collecting a connection relationship of unit operations for the ship; forming a plurality of operation paths from the overall process perspective by connecting the unit operations; deriving a critical path which directly affects the construction period of the entire process among the plurality of operation paths; and when the construction period for the entire process is shortened based on the critical path, reviewing whether or not other operation paths can be adjusted. 본 발명은 공정 관리 방법에 관한 것으로서, 선박을 건조하는 공정을 관리하는 방법으로서, 상기 선박에 대한 단위작업들의 연결관계를 수집하는 단계; 상기 단위작업들을 연결하여 전체 공정 관점에서 복수 개의 작업경로를 형성하는 단계; 상기 복수 개의 작업경로 중, 전체 공정의 공기에 직접적 영향을 주는 주요경로(Critical Path)를 도출하는 단계; 및 상기 주요경로를 기준으로 전체 공정에 대한 공기단축 시, 다른 작업경로의 조정 여부를 검토하는 단계를 포함하는 것을 특징으로 한다.