CONSTRUCTION APPARATUS FOR UPPER SLAB OF COMPOSITE TRUSS GIRDER BRIDGE
Disclosed is a construction apparatus for an upper slab of a composite truss girder bridge. An objective of the present invention is to construct an upper slab on a composite truss girder. The composite truss girder comprises: a lower slab; and a truss structure which is installed on an upper portio...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; kor |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Disclosed is a construction apparatus for an upper slab of a composite truss girder bridge. An objective of the present invention is to construct an upper slab on a composite truss girder. The composite truss girder comprises: a lower slab; and a truss structure which is installed on an upper portion of both sides of the lower slab, and comprises a plurality of abdominal members and an upper chord member connecting upper ends of the abdominal members. The construction apparatus for an upper slab of a composite truss girder bridge comprises: an upper rail arranged above the upper chord member in a longitudinal direction of the upper chord member and separated from the upper chord member; a plurality of support units arranged on an upper portion of the upper chord member in the longitudinal direction to support the upper rail; a frame unit installed to be moved along the upper rail; a side mold unit mounted on both ends of the frame unit and disposed outside the girder; and a holding unit to fix the side mold unit on the upper chord member. According to the construction apparatus for an upper slab of a composite truss girder bridge in accordance with the present invention, the upper slab can be constructed without installing and removing a supporting post and a mold to shorten construction time and reduce construction costs.
본 발명은 하부슬래브; 상기 하부슬래브의 양측 상부에 각각 설치되고, 다수의 복부재와, 상기 각 복부재의 상단부를 연결하는 상현재를 갖는 트러스구조체;를 포함하는 복합트러스 거더에 상부슬래브를 시공하기 위한 것으로서, 상기 상현재의 상측에 이격 배치되되, 상현재의 길이 방향을 따라 배치된 상부레일; 상기 상현재의 상부에 길이방향을 따라 배열되어 상기 상부레일을 받치는 다수의 서포트유닛; 상기 상부레일을 따라 이동 가능하게 설치된 프레임유닛; 상기 거더의 외측에 배치되도록 상기 프레임유닛의 양단부에 결합된 측부거푸집유닛; 및 상기 측부거푸집유닛을 상기 상현재에 고정하는 홀딩유닛;을 포함하여 이루어진 복합트러스 거더교의 상부슬래브 시공장치를 개시한다. 본 발명의 복합트러스 거더교의 상부슬래브 시공장치 의하면, 동바리 및 거푸집의 설치 및 해체 작업 없이 상부슬래브의 시공이 가능함으로써, 공기가 단축되고 공비가 절감되는 효과가 있다. |
---|