METHOD OF PROJECT MANAGEMENT FOR SHIP PRODUCTION

PURPOSE: A method of a project management for a ship production is provided to remove error occurrence according to a manual work by automatically connecting BOM(Bill OF Material)-ITEM and WBS(Work Breakdown Structure) ACTIVITY. CONSTITUTION: An item code is generated and BOM is confirmed(S102). A W...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HER, SUNG WOONG, KIM, SEI HYUN, EOM, JEONG JUN, KANG, BYOUNG GI, CHOI, BYUNG IN, CHO, JAE HONG, KIM, JI YOUNG, AHN, HO SUNG
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE: A method of a project management for a ship production is provided to remove error occurrence according to a manual work by automatically connecting BOM(Bill OF Material)-ITEM and WBS(Work Breakdown Structure) ACTIVITY. CONSTITUTION: An item code is generated and BOM is confirmed(S102). A WBS activity structure is generated(S104). A WBS ACTIVITY code is made and is uploaded(S106). The confirmed BOM and the uploaded WBX ACTIVITY code is automatically connected through connection logic(S110). If ECO is issued, a ECO issuing item is automatically reflected. An error breakdown is outputted.