CONSTRUCTION METHOD FOR ARCH TYPE SWEATING BATHROOM
A construction method for an arch type sweating bathroom is provided to solve the eccentric load of the stacking materials that are stacked to be slant inwardly, without using a separate support structure. A construction method for an arch type sweating bathroom fills filling materials between stack...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A construction method for an arch type sweating bathroom is provided to solve the eccentric load of the stacking materials that are stacked to be slant inwardly, without using a separate support structure. A construction method for an arch type sweating bathroom fills filling materials between stacking materials, installs a chimney and includes the steps of: manufacturing china clay bricks(11) as stacking materials by vacuum-sucking and naturally drying china clay paste(15) in which china clay, water and fiber are mixed; installing a bottom portion by stacking stone bricks as stacking materials that are stacked on the bottom part(10) of the sweating bathroom; and stacking the china clay bricks on the bottom part and stacking the china clay bricks to be inclined downwardly toward the center of the sweating bathroom(1). |
---|