The Method For Preventing Blast Furnace Stove from Simultaneous Burning

PURPOSE: A method for preventing simultaneous burning of hot stoves to maintain optimum blast furnace gas balance in iron works is provided to optimize supply balance of blast furnace gas by controlling the blast furnace gas so that the blast furnace gas is respectively burnt in each blast furnace f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KIM, BYEONG JIN, HAN, GI WON, SEO, BYEONG HAK, KIM, SEONG HYEON
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE: A method for preventing simultaneous burning of hot stoves to maintain optimum blast furnace gas balance in iron works is provided to optimize supply balance of blast furnace gas by controlling the blast furnace gas so that the blast furnace gas is respectively burnt in each blast furnace for different combustion period of times. CONSTITUTION: The method comprises the steps of installing first combustion time control timer(100) and second combustion time control timer(101) for recognizing combustion starting proper time of two hot stoves per each pertinent blast furnace inside programs of hot blast PLC(80) of first blast furnace, hot stove PLC(81) of second blast furnace, hot stove PLC(82) of third blast furnace, hot stove PLC(83) of fourth blast furnace and hot stove PLC(84) of fifth blast furnace; installing selection function on hot stove operation screen inside five blast furnace process computers(90-94) so that operator variably selects the combustion starting proper times by linking combustion starting proper times inside the five blast furnace hot stove PLC(80-84) of the iron works with a hot stove combustion starting time for the other blast furnace; sharing information of pig iron making operation control system(110) and energy center PLC(120) of the iron works to check gas storage level of first blast furnace gas reservoir(50) and second blast furnace gas reservoir(60) and blast furnace gas consumption amount of respective blast furnace hot stoves; and installing a synthetic hot stove operation controlling screen on monitor(110-1) of the pig iron making operation control system(110) to integrate information on combustion conditions of the five blast furnace hot stoves of the iron works with the first and second blast furnace gas reservoirs(50,60) and check the blast furnace gas consumption amount and gas storage level. 제철소 최적 고로가스 밸런스를 위한 열풍로의 동시연소 방지하기 위해 제1 고로에서 제5 고로에 각각 연결된 열풍로 피엘씨(80~84)에 해당 고로의 2기 열풍로 고유 연소시작 시간을 인식하는 제1, 제2 연소시간조정 타이머(100,101)가 프로그램 내부로 로딩되는 단계와, 열풍로 피엘씨(80~84) 내부의 연소시작 고유시간을 타 고로의 열풍로 연소시작 시간과 연계하여 운전자가 변경 선택 가능하도록 하는 공정 컴퓨터(90~94) 내부의 열풍로 운전화면에 선택기능이 설치되는 단계와, 제1, 제2 고로가스 저장소(50,60)의 가스레벨과 각 고로별 열풍로(20~24)의 고로가스 사용량의 확인을 위해 제선조업관리시스템(110)과 제철소의 에너지 센터 피엘씨(120)와 정보를 공유하는 단계와, 각 고로의 열풍로(20~24)의 연소조건 정보와 제1, 제2 고로가스 저장소(50,60)를 통합하여 관리할 수 있도록 제선조업관리 시스템(110)의 모니터(110-1)에 열풍로 운전관리 화면이 설치되는 단계로 구성되는 것을 특징으로 한다.