Method for installing underfloor heating to block the penetration of moisture

Disclosed is a floor heating construction method for blocking the penetration of moisture, which can block the penetration of moisture into a wooden structure of a curing machine on a floor surface and reduce a floor impact sound by constructing a moisture-permeable moisture barrier, sheet waterproo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: JEON HYEON WOO
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Disclosed is a floor heating construction method for blocking the penetration of moisture, which can block the penetration of moisture into a wooden structure of a curing machine on a floor surface and reduce a floor impact sound by constructing a moisture-permeable moisture barrier, sheet waterproofing, and mud seal in a complex manner at a part at which the wooden structure and a concrete foundation are combined. According to the present invention, the floor heating construction method for blocking the penetration of moisture comprises the steps of: (a) cleaning a floor slab surface; (b) constructing an insulation material on a floor slab; (c) forming an insertion part by cutting and removing a part of the insulation material to expose the floor slab; (d) inserting the wooden structure into the insertion part; and (e) constructing a heating pipe and a floor mortar on the insulation material. 목구조체와 콘크리트 기초가 잡합되는 부분에 투습방습지, 시트방수 및 머드실을 복합적으로 시공하여 바닥면의 양생기 목구조체로의 습기 침투를 차단할 수 있으며, 바닥충격음을 저감할 수 있는 습기의 침투를 차단하는 바닥난방 시공방법을 개시한다. 본 발명은 (a) 바닥슬래브 표면을 정리하는 단계; (b) 상기 바닥슬래브 상에 단열재를 시공하는 단계; (c) 상기 바닥슬래브가 노출되도록 상기 단열재의 일부를 절단 및 제거하여 삽입부를 형성하는 단계; (d) 상기 삽입부에 목구조재를 삽입하는 단계; 및 (e) 상기 단열재 상에 난방배관 및 바닥몰탈을 시공하는 단계를 포함하는 습기의 침투를 차단하는 바닥난방 시공방법을 제공한다.