Method of static load test of existing pile
The present invention relates to a static load test method for a pre-installed pile installed under an existing structure. The static load test method of the existing pile comprises the following steps of: a) excavating the ground under a base plate (11) of the structure (10); b) cutting the pre-ins...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; kor |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The present invention relates to a static load test method for a pre-installed pile installed under an existing structure. The static load test method of the existing pile comprises the following steps of: a) excavating the ground under a base plate (11) of the structure (10); b) cutting the pre-installed pile to separate the same into an upper pile (21) and a lower pile (22); and c) performing a static load test for the lower pile (22). The static load test method measures support force of the pre-installed pile without damage on the base plate.
본 발명은, 기존 구조물 아래에 설치되어 있는 기설치파일에 대한 정재하시험 방법에 있어서, 상기 정재하시험 방법은, a) 구조물(10)의 기초판(11) 아래의 지반을 굴착하는 단계; b) 기설치파일(20)을 절단하여 상부파일(21)과 하부파일(22)로 분리하는 단계; c) 상기 하부파일(22)에 대해 정재하시험을 실시하는 단계를 포함하는 기존 파일의 정재하시험 방법에 관한 것이다. |
---|