Method for mounting breast wall for roadway

A road retaining wall installation method of one aspect of the present invention comprises the following steps: placing a road retaining wall having a cross section in a form of an opening of a movable mold by using the moving mold and a moving concrete placing device; drilling a pipe hole with a pr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: OH NAN YOUNG
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A road retaining wall installation method of one aspect of the present invention comprises the following steps: placing a road retaining wall having a cross section in a form of an opening of a movable mold by using the moving mold and a moving concrete placing device; drilling a pipe hole with a predetermined distance interval on the road retaining wall by using a rotational punching tool having a length longer than a length of a drain hole and a radius of rotation corresponding to the diameter of the drain hole, 30 minutes to 1 hour after the road retaining wall placing step; inserting a drain pipe to the pipe hole; and fixing the drain pipe by drying the road retaining wall. According to the present invention, the road retaining wall is manufactured by moving the movable mold one time. 본 발명의 일 측면에 도로 옹벽 설치 방법은, 이동식 거푸집과 이동식 콘크리트 타설 장치를 이용하여 이 동식 거푸집의 개방구 형태의 단면을 갖는 도로 옹벽 타설 단계, 도로 옹벽 타설 단계 후, 30분 내지 1시간 후 도로 옹벽의 소정의 일정 거리 간격으로 배수홀의 직경에 대응하는 회전 반경과 배수홀의 길이보다 더 긴 길이를 갖는 회전 펀칭 도구를 이용하여, 파이프 홀을 뚫는 단계, 파이프 홀에 배수 파이프를 삽입하는 단계 및 도로 옹벽을 건조시켜 배수 파이프를 고정시키는 단계를 포함한다.