Construction method of cut off wall for underground dam

The present invention relates to a method to construct a cutoff wall for an underground dam. According to the present invention, the method to construct a cutoff wall for an underground dam comprises: a female pile hole excavation step of excavating female pile holes spaced apart from each other on...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KOO, JA KAP, PARK YOUNG JUN
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present invention relates to a method to construct a cutoff wall for an underground dam. According to the present invention, the method to construct a cutoff wall for an underground dam comprises: a female pile hole excavation step of excavating female pile holes spaced apart from each other on a position in which an underground dam is installed; a female pile forming step of filling a female pile filler with a higher permeability coefficient than that of a male pile filler in the female pile holes; a male pile hole excavation step of excavating male pile holes between the female piles to cut a part of both the female piles; and a male pile forming step of filling a male pile filler with a lower permeability coefficient than that of the female pile filler in the male pile holes. The female pile filler is filled in a bad male pile hole, which is cut by a lower degree than a predetermined degree or is not cut, to form a bad male pile. An additional male pile hole is excavated between the bad male pile and the adjacent female pile, and is filled with the male pile filler to form an additional male pile. Accordingly, the drilling holes are excavated and the pile fillers are filled in the drilling holes, such that a pile is formed to construct a cutoff wall for an underground dam. Thus, it is not needed to excavate all portions of the ground in which the cutoff wall of the underground dam is planned to be constructed, thereby reducing a construction period and construction costs. 본 발명은 지중댐이 설치될 위치에 서로 이격되도록 암말뚝공들을 굴착하는 암말뚝공 굴착 단계; 상기 암말뚝공들의 내부에 하기 숫말뚝충전재보다 투수계수가 높은 암말뚝충전재를 충전하는 암말뚝 형성 단계; 상기 암말뚝들의 사이사이에 양 암말뚝의 일부가 절삭되도록 숫말뚝공들을 굴착하는 숫말뚝공 굴착 단계; 상기 숫말뚝공들의 내부에 상기 암말뚝충전재보다 투수계수가 낮은 숫말뚝충전재를 충전하는 숫말뚝 형성 단계;를 포함하고, 상기 숫말뚝공 굴착 단계에서 암말뚝의 절삭의 정도가 일정 이하이거나 절삭되지 않은 불량숫말뚝공에는 상기 암말뚝충전재를 충전하여 불량숫말뚝을 형성하고, 상기 불량숫말뚝과 인접한 상기 암말뚝 사이에 추가숫말뚝공을 굴착한 후 상기 숫말뚝충전재를 충전하여 추가숫말뚝을 형성하는 것을 특징으로 하는 지중댐용 차수벽체 시공방법에 관한 것으로서, 굴착공들을 천공하고 굴착공들의 내측으로 말뚝충전재들을 충전하여 말뚝을 형성함으로써 지중댐용 차수벽체를 시공할 수 있으므로 지중댐용 차수벽체의 시공이 계획된 지반의 전부분을 굴착하지 않아도 되어 시공기간 및 시공비용을 절감할 수 있는 지중댐용 차수벽체를 시공할 수 있다.