Auger pile

The present invention relates to an auger pile. A forward helix to cut with a drilling head and a cutting blade is disposed on a lower end of a first auger pile, and a reverse helix for stirring is disposed on an upper portion of a forward helix for cutting. A reverse helix for stirring is disposed...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHO, JUN YEOL, PARK, JIN MAN
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present invention relates to an auger pile. A forward helix to cut with a drilling head and a cutting blade is disposed on a lower end of a first auger pile, and a reverse helix for stirring is disposed on an upper portion of a forward helix for cutting. A reverse helix for stirring is disposed on a second auger pile connected to an upper end of the first auger pile to inject cement milk in a pipe insertion step by drilling and cutting the ground to sufficiently stir cut ground soil, and the injected cement milk to complete construction by simply performing a head cleaning step and a dynamic loading test step when the stirred ground soil and cement milk are hardened without performing a separate grouting step after pipe insertion is completed; thereby construction time being able to be shortened by half. 본 발명은 오거 파일에 관한 것으로, 제1 오거 파일의 하단에는 천공 헤드와 함께 절삭날을 가지는 절삭용 순방향 헬릭스가 구비되고, 그 상부에는 교반용 역방향 헬릭스가 구비되며, 제1 오거 파일의 상단에 연결되는 제2 오거 파일에는 교반용 역방향 헬릭스가 구비되어 지반의 천공과 절삭에 의한 관입 단계에서 시멘트 밀크를 주입함으로써 절삭된 지반토사와 주입된 시멘트 밀크가 충분히 교반되어 관입이 완료된 후 별도의 그라우팅 단계를 거치지 않고, 교반된 지반토사와 시멘트 밀크가 경화되면, 두부 정리 단계와 동재하시험 단계를 거치는 것만으로 시공을 완료할 수 있으므로 공기를 절반 정도로 단축시킬 수 있도록 한 것이다.