GUIDING WALL FOR SEWAGE TREATMENT

The present invention relates to a training wall for a sewage treatment plant. The training wall for a sewage treatment plant comprises: fixating pillars fixated and mounted to a purification plant at an interval; and a wall body fixated and mounted between the fixating pillars and between the fixat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SIM, JAE HWANG
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present invention relates to a training wall for a sewage treatment plant. The training wall for a sewage treatment plant comprises: fixating pillars fixated and mounted to a purification plant at an interval; and a wall body fixated and mounted between the fixating pillars and between the fixating pillars. The wall body includes a wall body frame having the inside formed by penetration, and an assembly panel mounted to the inside of the wall body frame. The region in which the wall body frame and the assembly panel make a contact can be fixated through ultrasound welding. According to the present invention, the training wall can be fixated between the fixating pillars without joints such as an anchor bolt, bolt, screw, and the like, and has less operation time, operation costs, and material costs. 본 발명은 하수처리장용 도류벽에 관한 것으로서, 하수처리장의 정수장에 간격을 두고 고정장착되는 고정기둥; 및 상기 고정기둥과 고정기둥의 사이에 고정장착되는 벽체;를 포함하여 이루어지되, 상기 벽체는 내부가 관통형성되는 벽체 프레임과 상기 벽체 프레임의 내부에 장착되는 조립 패널로 구성되고, 상기 벽체 프레임과 조립 패널이 맞닿는 부분은 초음파 융착을 통해 고정될 수 있다. 본 발명에 따르면, 고정기둥의 사이에 장착되는 벽체의 고정시 앵커볼트, 볼트, 나사 등과 같은 체결구 없이 고정할 수 있을 뿐만 아니라 작업시간과 작업비용 및 자재비용을 절감할 수 있는 효과가 있다.