YOKE SUPPORT UNIT FOR 1ST NEEDLE BEARING INDENTATION AND CAULKING APPARATUS OF UNIVERSAL JOINT
The present invention relates to a yoke support device for primary indentation of a needle bearing and a caulking apparatus of a universal joint, allowing external force transferred to a yoke wing to be distributed when a needle bearing is indented and is caulked by a servo-motor detention system an...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; kor |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The present invention relates to a yoke support device for primary indentation of a needle bearing and a caulking apparatus of a universal joint, allowing external force transferred to a yoke wing to be distributed when a needle bearing is indented and is caulked by a servo-motor detention system and a pneumatic synchronization control caulking device, and allowing the needle bearing to easily be assembled with a cross-shaped spider floating member and an upper clamp floating member regardless of the processed shape of a yoke and an error in processing. The yoke support device for primary indentation of a needle bearing and a caulking apparatus of a universal joint comprises: a servo-motor detention system (20) positioned on both sides of a first yoke (1a) to indent the needle bearing (4); and a placing jig member (40) placing the first yoke (1a) at a regular position while the needle bearing (4) is indented to the first yoke (1a). The yoke support device comprises a taper clamping jig (41) and a pneumatic synchronization control caulking device (21). The taper clamping jig (41) supports the inside (1) of a wing part (1) of the first yoke (1a) to prevent the wing part (1) from being deformed when the needle bearing (4) is indented. The pneumatic synchronization control caulking device (21) connects a pneumatic pressure system by a rack (21e) and a pinion (21f) to perform synchronization control when performing caulking work such that the needle bearing (4) can be indented from both sides, simultaneously.
본 발명은, 유니버설 조인트의 니들베어링 1차 압입 및 코킹장치용 요크 지지 장치에 관한 것으로서, 서보모터 압입 시스템과 유공압 동기제어 코킹장치에 의해 니들 베어링의 압입 및 코킹시 요크 날개에 전해지는 외력이 동일하게 배분되도록 하고, 십자형 스파이더 플로팅 부재 및 상부 클램프 플로팅 부재에 의해 요크의 가공형상 및 가공 오차에 관계없이 니들 베어링을 용이하게 조립할 수 있도록 하는 데 그 목적이 있다. 이를 위하여 본 발명은, 제1요크(1a)의 양측에 위치되어 니들베어링(4)을 압입하는 서보모터 압입시스템(20)과; 상기 제1요크(1a)에 니들베어링(4)을 압입하는 동안 상기 제1요크(1a)를 정위치에 안착시키는 안착 지그 부재(40);를 포함하여 이루어지는 유니버설 조인트의 니들 베어링 1차 압입 및 코킹장치용 요크 지지 장치에 있어서, 상기 니들베어링(4)을 압입할 때 상기 제1요크(1a)의 날개부(1')가 변형되지 않도록 상기 제1요크(1a)의 날개부(1') 내측(1'')을 지지하는 테이퍼 클램핑 지그(41)와; 코킹 작업시 유공압시스템을 랙(21e)과 피니언(21f)으로 연결하여 동기제어함으로써 니들베어링(4)을 양쪽에서 동시에 압입하도록 하는 유공압 동기제어 코킹장치(21)를 포함하는 것을 특징으로 한다. |
---|