BANKING CONSTRUCTION FOR USING CAISSON IN DIRECT BOTTOM-FITTING SYSTEM
PURPOSE:To eliminate mound construction and shorten the term of construction, by cutting off the bottom section of a vessel unit previously according to the form of rugged sea-bottom actual-land. CONSTITUTION:According to the land form of rugged sea-bottom bottom-fitting land 7, the bottom section o...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To eliminate mound construction and shorten the term of construction, by cutting off the bottom section of a vessel unit previously according to the form of rugged sea-bottom actual-land. CONSTITUTION:According to the land form of rugged sea-bottom bottom-fitting land 7, the bottom section of a vessel unit is cut off to form a caisson bank unit 6. After that, the bank unit 6 is taken to the bottom-fitting land 7 in tow, and a floating unit 4' is filled up with seawater 12 and is sunken. After that, in the stable chambers 17 of the bank unit 6, fill earth 13 is cast. As a result, the plane-finish of the rugged section of sea-bottom land and mound construction are not needed, and the cost can be extremely reduced and the term of construction can be shortened. |
---|