CONSTRUCTION OF UNDERGROUND CONTINUOUS WALL
PURPOSE:To avoid the occurrence of escaping phenomenon or avoidance of hard concrete by excavator by a method in which a wide aperture is formed between preceding elements, and excavation is made under the guidance of the wide aperture for the excavator. CONSTITUTION:A spacer box 5 is set on at leas...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To avoid the occurrence of escaping phenomenon or avoidance of hard concrete by excavator by a method in which a wide aperture is formed between preceding elements, and excavation is made under the guidance of the wide aperture for the excavator. CONSTITUTION:A spacer box 5 is set on at least upper end of an excavated ground in the direction of joining an excavated pit 1 for forming preceding element and concrete 4 is placed to form the preceding element. After the concrete hardens, the spacer box 5 is removed away to form a wide interval with a great end spacing between the preceding elements. Under the guidance of the wide interval for excavator, excavation is made between the two preceding elements. |
---|