INSTALLING METHOD OF CAISSON
PURPOSE:To ensure weight which is capable of resisting against an external force produced during installation and to stabilize a caisson during installation, by a method wherein weight cells are temporarily placed on the sunk caisson, and sea water is poured in the tank part of the weight cell. CONS...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To ensure weight which is capable of resisting against an external force produced during installation and to stabilize a caisson during installation, by a method wherein weight cells are temporarily placed on the sunk caisson, and sea water is poured in the tank part of the weight cell. CONSTITUTION:A caisson 1 is installed in a position as water is poured in chambers 5 in the caisson 1, weight cells 2 are placed on the caisson 1, water is poured into a tank part 4 of the weight cell 2, and weight, which is capable of resisting against an external force produced during installation. Sand is charged in a chamber 6 in the caisson 1 through a through-hole 3 in the weight cell 2, and after filling sand is charged, water in the weight cells 2 is drained. After drainage is completed, the weight cells 2 is transported to other caisson, which is intended to be installed, with the aid of a crane ship. |
---|