CONSTRUCTION OF SHEATHING WALL

PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SAKAI MASAYUKI, FUJINAMI YASUO, TAKECHI KATSUYUKI, HAYAKAWA MITSUTAKA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SAKAI MASAYUKI
FUJINAMI YASUO
TAKECHI KATSUYUKI
HAYAKAWA MITSUTAKA
description PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPS5980822A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPS5980822A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPS5980822A3</originalsourceid><addsrcrecordid>eNrjZJBz9vcLDgkKdQ7x9PdT8HdTCPZwdQzx8PRzVwh39PHhYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxXgHBppYWBhZGRo7GRCgBAIrfIWo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION OF SHEATHING WALL</title><source>esp@cenet</source><creator>SAKAI MASAYUKI ; FUJINAMI YASUO ; TAKECHI KATSUYUKI ; HAYAKAWA MITSUTAKA</creator><creatorcontrib>SAKAI MASAYUKI ; FUJINAMI YASUO ; TAKECHI KATSUYUKI ; HAYAKAWA MITSUTAKA</creatorcontrib><description>PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1984</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19840510&amp;DB=EPODOC&amp;CC=JP&amp;NR=S5980822A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19840510&amp;DB=EPODOC&amp;CC=JP&amp;NR=S5980822A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SAKAI MASAYUKI</creatorcontrib><creatorcontrib>FUJINAMI YASUO</creatorcontrib><creatorcontrib>TAKECHI KATSUYUKI</creatorcontrib><creatorcontrib>HAYAKAWA MITSUTAKA</creatorcontrib><title>CONSTRUCTION OF SHEATHING WALL</title><description>PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1984</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJBz9vcLDgkKdQ7x9PdT8HdTCPZwdQzx8PRzVwh39PHhYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxXgHBppYWBhZGRo7GRCgBAIrfIWo</recordid><startdate>19840510</startdate><enddate>19840510</enddate><creator>SAKAI MASAYUKI</creator><creator>FUJINAMI YASUO</creator><creator>TAKECHI KATSUYUKI</creator><creator>HAYAKAWA MITSUTAKA</creator><scope>EVB</scope></search><sort><creationdate>19840510</creationdate><title>CONSTRUCTION OF SHEATHING WALL</title><author>SAKAI MASAYUKI ; FUJINAMI YASUO ; TAKECHI KATSUYUKI ; HAYAKAWA MITSUTAKA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPS5980822A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1984</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SAKAI MASAYUKI</creatorcontrib><creatorcontrib>FUJINAMI YASUO</creatorcontrib><creatorcontrib>TAKECHI KATSUYUKI</creatorcontrib><creatorcontrib>HAYAKAWA MITSUTAKA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SAKAI MASAYUKI</au><au>FUJINAMI YASUO</au><au>TAKECHI KATSUYUKI</au><au>HAYAKAWA MITSUTAKA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION OF SHEATHING WALL</title><date>1984-05-10</date><risdate>1984</risdate><abstract>PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPS5980822A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title CONSTRUCTION OF SHEATHING WALL
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T15%3A12%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SAKAI%20MASAYUKI&rft.date=1984-05-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPS5980822A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true