CONSTRUCTION OF SHEATHING WALL
PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying m...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SAKAI MASAYUKI FUJINAMI YASUO TAKECHI KATSUYUKI HAYAKAWA MITSUTAKA |
description | PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPS5980822A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPS5980822A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPS5980822A3</originalsourceid><addsrcrecordid>eNrjZJBz9vcLDgkKdQ7x9PdT8HdTCPZwdQzx8PRzVwh39PHhYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxXgHBppYWBhZGRo7GRCgBAIrfIWo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION OF SHEATHING WALL</title><source>esp@cenet</source><creator>SAKAI MASAYUKI ; FUJINAMI YASUO ; TAKECHI KATSUYUKI ; HAYAKAWA MITSUTAKA</creator><creatorcontrib>SAKAI MASAYUKI ; FUJINAMI YASUO ; TAKECHI KATSUYUKI ; HAYAKAWA MITSUTAKA</creatorcontrib><description>PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1984</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19840510&DB=EPODOC&CC=JP&NR=S5980822A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19840510&DB=EPODOC&CC=JP&NR=S5980822A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SAKAI MASAYUKI</creatorcontrib><creatorcontrib>FUJINAMI YASUO</creatorcontrib><creatorcontrib>TAKECHI KATSUYUKI</creatorcontrib><creatorcontrib>HAYAKAWA MITSUTAKA</creatorcontrib><title>CONSTRUCTION OF SHEATHING WALL</title><description>PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1984</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJBz9vcLDgkKdQ7x9PdT8HdTCPZwdQzx8PRzVwh39PHhYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxXgHBppYWBhZGRo7GRCgBAIrfIWo</recordid><startdate>19840510</startdate><enddate>19840510</enddate><creator>SAKAI MASAYUKI</creator><creator>FUJINAMI YASUO</creator><creator>TAKECHI KATSUYUKI</creator><creator>HAYAKAWA MITSUTAKA</creator><scope>EVB</scope></search><sort><creationdate>19840510</creationdate><title>CONSTRUCTION OF SHEATHING WALL</title><author>SAKAI MASAYUKI ; FUJINAMI YASUO ; TAKECHI KATSUYUKI ; HAYAKAWA MITSUTAKA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPS5980822A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1984</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SAKAI MASAYUKI</creatorcontrib><creatorcontrib>FUJINAMI YASUO</creatorcontrib><creatorcontrib>TAKECHI KATSUYUKI</creatorcontrib><creatorcontrib>HAYAKAWA MITSUTAKA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SAKAI MASAYUKI</au><au>FUJINAMI YASUO</au><au>TAKECHI KATSUYUKI</au><au>HAYAKAWA MITSUTAKA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION OF SHEATHING WALL</title><date>1984-05-10</date><risdate>1984</risdate><abstract>PURPOSE:To simplify the construction of sheathing wall by a method in which the ground between master piles is excavated to the mountain side rather than the surface of a flange on the excavation side of the master piles, a reinforcing net is laid between the master piles, and a hydraulic spraying material is sprayed onto the reinforcing net. CONSTITUTION:The ground between master piles 1 is excavated to the mountain side rather than the surface of a flange 11 on the excavation side of the master piles 1. A reinforcing metal net 6 is laid between the master piles 1 in almost parallel with the ground with a spacing from the ground, and both ends of the net 6 are fixed by welding to the master piles 1 or held by driving temporary stopper pins into the ground. A hydraulic spraying material, e.g. cement mortar or concrete, etc., is sprayed until the net 6 is buried to form a sprayed wall 8. The ground of mountainous area can thus be protected by the formation of sprayed walls without the needs for cross sheet piles or embedding work.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JPS5980822A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | CONSTRUCTION OF SHEATHING WALL |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T15%3A12%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SAKAI%20MASAYUKI&rft.date=1984-05-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPS5980822A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |