TANK TRANSFER METHOD FROM OLD TO NEW HULL
PURPOSE:To modify the hull efficiently in limited dock section by arranging the old and new hulls in the dock while facing each other then sequentially repeating draw-in of tank into new hull, removal of old hull and construction of new hull. CONSTITUTION:Old hull 5 where the bow is cut-off is arran...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To modify the hull efficiently in limited dock section by arranging the old and new hulls in the dock while facing each other then sequentially repeating draw-in of tank into new hull, removal of old hull and construction of new hull. CONSTITUTION:Old hull 5 where the bow is cut-off is arranged in front of a new hull 4 under construction while facing its cut face toward the new hull 4. Then a tank 7 in old hull 5 is pulled into the new hull 4. Thereafter the hull construction A at the tank supporting section of old hull 5 is dismantled and removed while the hull construction B at the tank supporting section of new hull 4 is built. This cycle is repeated to modify the hull of LNG tanker efficiently in limited dock section. |
---|