METHOD OF OPERATING STEAM TURBINES UTILIZING WASTE HEAT BOILER SET REMOTE

PURPOSE:To operate both of a steam turbine installed in a section for pressure controlled operation and a steam turbine installed in a section for speed controlled operation always in parallel to each other, by controlling the opening of a steam control valve installed in the section for speed contr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KOMATSU KATSUJIROU, KIKUCHI KAZUNARI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE:To operate both of a steam turbine installed in a section for pressure controlled operation and a steam turbine installed in a section for speed controlled operation always in parallel to each other, by controlling the opening of a steam control valve installed in the section for speed controlled operation in response to a signal relating to increase and decrease of the flow rate of steam supplied to the steam turbine installed in the section for pressure controlled operation. CONSTITUTION:A means 15 for detecting and setting the capacity of power generation is connected to a generator 6 which is connected directly to a steam turbine 5 installed in a section for pressure controlled operation. On the basis of the set value of said means 15, the opening of a steam control valve 12 for another steam turbine 9 installed in a section for pressure controlled operation is controlled by a speed control means 8. In case that the amount of steam supplied from a waste heat boiler 1 is small, output of the steam turbine 9 is lowered, so that the steam turbine 5 enabled to operate continuously. In case that the amount of steam supplied from the boiler 1 is large, on the other hand, the valve 7 is moved in a closing direction by an instruction given from a pressure control means 4 and pressure at the inlet of the steam turbine is kept constant. Thus, since both of the turbines 5, 9 are operated always in parallel to each other, it is enabled to reduce labors of operator.