INPROVEMENT WORK FOR SOFT GROUND

PURPOSE:To consolidate and dehydrate only the soft ground to be improved by a method in which a water-impermeable wall is constructed around the soft ground to be improved, banking is formed, and forced dehydration is made. CONSTITUTION:A water-impermeable wall 1 is constructed in the surrounding gr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: YOKOGAWA HIDEO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE:To consolidate and dehydrate only the soft ground to be improved by a method in which a water-impermeable wall is constructed around the soft ground to be improved, banking is formed, and forced dehydration is made. CONSTITUTION:A water-impermeable wall 1 is constructed in the surrounding ground of a preset ground Wa to be improved in soft ground W, a water-pumping pipe 4 with a well point 3 is driven into the ground Wa, and an infiltration pipe 5 whose one end is to be connected with the pipe 4 and the other end is to be connected with a pump (not illustrated) is laid. Then, sand 6 is laid on the ground Wa, homogeneous clay is banked 7 on the sand 6, and water is sucked up forcibly by the pump.