CONSTRUCTION METHOD FOR REINFORCED CONCRETE BRIDGE PIER
PROBLEM TO BE SOLVED: To reduce the reinforcing bar assembling work and heavy hoist work on work scaffolds, to shorten the construction period, and to reduce the cost. SOLUTION: A first form structural body A and a first form structural body B are assembled with a first and a second concrete form bo...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To reduce the reinforcing bar assembling work and heavy hoist work on work scaffolds, to shorten the construction period, and to reduce the cost. SOLUTION: A first form structural body A and a first form structural body B are assembled with a first and a second concrete form bodies 6, 8 containing a form main body 10 made of a precast concrete board, and a second form structural body 28 containing intermediate tie hoops 44 and separators 24 is assembled. A bending main member is erected at the construction site of a concrete bridge pier, and the first form structural body B and the second form structural body 28 are combined and connected to construct a concrete form rectangular on the plan view. Concrete is placed inside the concrete form. |
---|