FLOATING CONTAINER YARD
PROBLEM TO BE SOLVED: To prevent deflection of floating construction and to eliminate problems in running performance and loading performance of a container crane by structuring a container yard with a main floating portion and a second floating portion formed separately from the main floating porti...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To prevent deflection of floating construction and to eliminate problems in running performance and loading performance of a container crane by structuring a container yard with a main floating portion and a second floating portion formed separately from the main floating portion, and mounting the container crane runnable on the second floating portion. SOLUTION: A floating container yard 1A is made of a main floating portion 10A and a second floating portion 5A formed structurally separate from the main floating portion. Running rails 57 are provided on the second floating portion 5A and a container crane 2 is mounted thereon runnably. Then, a container ship 3 is moored to a side wall 6A on an ocean side of the second floating portion 5A and the container crane 2 is run along the side wall 6A to load the container ship 3. Accordingly, generation of deflection in lateral direction perpendicular to the running direction of the container crane due to running position of the container crane is prevented, eliminating the problems against running performance and loading performance. |
---|