SLOPE FRAME, SLOPE FRAME CONSTRUCTION METHOD AND SLOPE DIGGING METHOD
PROBLEM TO BE SOLVED: To provide a slope frame, a slope frame construction method, and a slope digging method capable of liberating a worker from painful work of human labor, reducing dangerous work, necessitating no special tool such as a chuck member when a hole drilling device is fixed or reactio...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a slope frame, a slope frame construction method, and a slope digging method capable of liberating a worker from painful work of human labor, reducing dangerous work, necessitating no special tool such as a chuck member when a hole drilling device is fixed or reaction force is taken when a hole is drilled, and breaking no constructed slope frame. SOLUTION: A slope frame is provided with a gridlike pattern frame 1, a reinforcing bar 2, a pipe for drilling hole 3 provided at a crossing point of the gridlike pattern frame 1, and a pipe for reaction force 4 provided with a device for taking reaction force when a hole is drilled. The pipe for reaction force is not specified in particular, and for example, a metallic pipe such as a steel pipe or a pipe made of vinyl chloride can be used. Moreover, the pipe may have a rectangular cross section. |
---|