CONSTRUCTION METHOD OF BATHROOM BLOCK AND BATHROOM BLOCK STRUCTURE
PROBLEM TO BE SOLVED: To efficiently perform a series of works by erecting an inner wall frame in a block consisting of a washroom and a bathroom, constructing a wall face and a ceiling after forming a floor of the washroom, and partitioning the bathroom from the washroom by a decorative panel. SOLU...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To efficiently perform a series of works by erecting an inner wall frame in a block consisting of a washroom and a bathroom, constructing a wall face and a ceiling after forming a floor of the washroom, and partitioning the bathroom from the washroom by a decorative panel. SOLUTION: Upon completion of the exterior construction work of a house, an inner wall frame W is erected along a wall shaft set to form a floor 3 of a washroom 2 of a bathroom block 1 first. Next, a bathroom 10 is assembled in adjacent to the washroom 2, and plaster boards are attached to a wall and a ceiling of the washroom 2. After that, a wall panel 13 and a ceiling panel 14 of the bathroom 10 are attached. Furthermore, a decorative wall panel 5 provided with a storage shelf 5a and a decorative panel 7 provided with a transom panel 6 partitioning an upper space of ceiling panel 14 of the bathroom and the washroom from each other are attached in a boundary part between the washroom 2 and the bathroom 10. This decorative panel 7 is used in common as a partition wall, and the whole bathroom block 1 is constructed by a series of works by a same construction firm. Consequently, a waiting time in a process is eliminated and a construction period is sheatened. |
---|