BLASTING METHOD
PROBLEM TO BE SOLVED: To dissipate excessive clearance water pressure in a short period of time and to reduce foundation vibration in the specified direction out of foundation vibration due to blasting. SOLUTION: A clearance water pressure dissipation part 2 is provided in a peripheral foundation of...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To dissipate excessive clearance water pressure in a short period of time and to reduce foundation vibration in the specified direction out of foundation vibration due to blasting. SOLUTION: A clearance water pressure dissipation part 2 is provided in a peripheral foundation of a blasting hole 1 at the time of blasting by using the blasting hole 1 drilled in the foundation. It is possible to provide the clearance water pressure dissipation part 2 by drilling a clearance water pressure dissipation hole (groove is available) extending at least lower than a ground water level in a peripheral foundation of the blasting hole 1. On a soft foundation high at an underground water level, as the clearance water pressure dissipation hole 2A does not selft-support it until after drilling or blasting, a water permeable material of a gravel material, etc., is charged in the inside of the dissipation hole 2A. |
---|