CONSTRUCTION METHOD OF STEEL TOWER

PROBLEM TO BE SOLVED: To eliminate work in a high place for assembling a steel tower to ensure safety, eliminate a structural girder or a bearing frame for bearing load from the steel tower to make it possible to reduce temporary materials and permanent materials and to construct the steel tower at...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHIMAMURA SHIYOUJI, TAKAHASHI TAKETOSHI, OGIWARA YUKIMASA, KOSHIDA HIROSHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To eliminate work in a high place for assembling a steel tower to ensure safety, eliminate a structural girder or a bearing frame for bearing load from the steel tower to make it possible to reduce temporary materials and permanent materials and to construct the steel tower at the same time as construction work of a building to shorten a construction period of time. SOLUTION: In a construction method of a steel tower 8 installed on the rooftop of a building 1, a steel tower assembly space 5 is positioned right under the installation of the steel tower 8 and is provided to the inside of the building 1 in the course of construction. The steel tower 8 constructed in the space 5 is pulled up or pushed up with jack, etc., to slide it to the rooftop to move, and the lower part of the steel tower 8 is fixed to the building in a state to insert it inside the building 1.