CONTROLLING EQUIPMENT OF AIR CONDITIONER
PROBLEM TO BE SOLVED: To provide controlling equipment of an air conditioner which can prevent lowering of an awakening level in case of rise of room temperature without impairing confortableness of a person subjected to air conditioning. SOLUTION: When a variation mode is selected by an operation m...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide controlling equipment of an air conditioner which can prevent lowering of an awakening level in case of rise of room temperature without impairing confortableness of a person subjected to air conditioning. SOLUTION: When a variation mode is selected by an operation mode selecting part 108 at the time when room temperature is at a temperature set by a room temperature setting part 102 under the control of a room temperature control part 103, a variation starting part 109 switches an operation control of a compressor C from the one by the room temperature control part 103 before that time over to the one by a room temperature variation control part 106 and the operation control of a blower F from the one by an air velocity control part 105 before that time over to the one by an air velocity variation control part 107 respectively. The room temperature variation control part 106 sends a control signal to the compressor C so that the room temperature may vary between the set temperature and a lower limit temperature being lower than the set temperature, while the air velocity variation control part 107 sends a control signal to the blower F so that air velocity may vary in such a manner that prescribed upper-limit and lower-limit air velocities are repeated alternately, during the time when the room temperature rises from the lower limit temperature to the set temperature. |
---|