CRIB STRUCTURE FOR GREENING FACE OF SLOPE

PROBLEM TO BE SOLVED: To conduct construction works simply and safely by upwards connecting a vertical crib at the lower end section of an oblique crib and extending a scaffolding section projected to the front of the vertical crib at the front end section of a horizontal crib bridged between both u...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: AKIYAMA KEIJIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To conduct construction works simply and safely by upwards connecting a vertical crib at the lower end section of an oblique crib and extending a scaffolding section projected to the front of the vertical crib at the front end section of a horizontal crib bridged between both upper end sections of the oblique crib and the vertical crib. SOLUTION: A vertical crib 22 is connected rotatably at the lower end section of an oblique crib 21 by connectors 25 upwards. A horizontal crib 23, in which a scaffolding section 24 is installed at a front end section and which is built between both upper end sections of the oblique crib 21 and the vertical crib 22, is coupled movably at the upper end section of the oblique crib 21 by connectors 25, and a crib structure 2 for greening the face of a slope is formed. The oblique crib 21 of the crib structure 2 is arranged while being brought into contact with the face of the slope and fixed by an anchor at the time of the execution of works. Bag bodies, in which a vegetation base material is housed in a net structure, are disposed and fixed on the inside of the crib structure 2, and the horizontal crib 23 is stretched over the upper section of the vertical crib 22 and fastened. The crib structures 2 are fixed on the whole face of the slope at proper intervals, the vegetation base material is charged into the crib structures 2, and the stepping surface of the scaffolding section 24 is bent upwards.