ELEVATING EQUIPMENT
PROBLEM TO BE SOLVED: To conduct an elevating operation almost continuously. SOLUTION: Elevating equipment 2 has a guide rod 4, three sets of chuck mechanisms 6, 8 and 10 and two sets of jack mechanisms 12 and 14. In the case when the elevating equipment 2 is made to rise, locking of the guide rod 4...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!