UNDERGROUND AND ABOVEGROUND SIMULTANEOUS EXECUTION METHOD OF STRUCTURE

PURPOSE: To provide an execution method which remarkably reduces the construction period, by which the above ground and underground parts can be simultaneously executed immediately after the construction of earth retaining wall. CONSTITUTION: At first, an earth retaining wall 1 for a diaphragm wall...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TAJIMA EIJI, TAKENO MASAHIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE: To provide an execution method which remarkably reduces the construction period, by which the above ground and underground parts can be simultaneously executed immediately after the construction of earth retaining wall. CONSTITUTION: At first, an earth retaining wall 1 for a diaphragm wall is constructed and then a truss beam 3 is laid on the ground so as to connect to the earth retaining wall 1. Thereafter, the erection works on the ground constructing an aboveground part (A) on the truss beam 3 and the underground works to excavate the ground within the earth retaining wall and construct an underground part B are parallelly and independently carried out. And finally the aboveground part (A) and the underground part (B) are unified together.