INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE

PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SUNAMI TAKAYOSHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SUNAMI TAKAYOSHI
description PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0734532A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0734532A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0734532A3</originalsourceid><addsrcrecordid>eNrjZHDy9HMJDQ4J8nT08YxyDPH091MA8kKdQ0KDXBXc_IMUfD1dXHxcFRz9XBQ8PN09gjyDXRVcwl19fDz93BU8_EODXXkYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWJyal5qSbxXgIeBubGJqbGRozERSgDpsStd</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><source>esp@cenet</source><creator>SUNAMI TAKAYOSHI</creator><creatorcontrib>SUNAMI TAKAYOSHI</creatorcontrib><description>PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.</description><edition>6</edition><language>eng</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>1995</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19950203&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0734532A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19950203&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0734532A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUNAMI TAKAYOSHI</creatorcontrib><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><description>PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1995</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHDy9HMJDQ4J8nT08YxyDPH091MA8kKdQ0KDXBXc_IMUfD1dXHxcFRz9XBQ8PN09gjyDXRVcwl19fDz93BU8_EODXXkYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWJyal5qSbxXgIeBubGJqbGRozERSgDpsStd</recordid><startdate>19950203</startdate><enddate>19950203</enddate><creator>SUNAMI TAKAYOSHI</creator><scope>EVB</scope></search><sort><creationdate>19950203</creationdate><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><author>SUNAMI TAKAYOSHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0734532A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1995</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>SUNAMI TAKAYOSHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUNAMI TAKAYOSHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><date>1995-02-03</date><risdate>1995</risdate><abstract>PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH0734532A
source esp@cenet
subjects BUILDING
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
WALLS, e.g. PARTITIONS
title INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T14%3A33%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUNAMI%20TAKAYOSHI&rft.date=1995-02-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0734532A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true