INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE
PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUNAMI TAKAYOSHI |
description | PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0734532A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0734532A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0734532A3</originalsourceid><addsrcrecordid>eNrjZHDy9HMJDQ4J8nT08YxyDPH091MA8kKdQ0KDXBXc_IMUfD1dXHxcFRz9XBQ8PN09gjyDXRVcwl19fDz93BU8_EODXXkYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWJyal5qSbxXgIeBubGJqbGRozERSgDpsStd</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><source>esp@cenet</source><creator>SUNAMI TAKAYOSHI</creator><creatorcontrib>SUNAMI TAKAYOSHI</creatorcontrib><description>PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.</description><edition>6</edition><language>eng</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>1995</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19950203&DB=EPODOC&CC=JP&NR=H0734532A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19950203&DB=EPODOC&CC=JP&NR=H0734532A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUNAMI TAKAYOSHI</creatorcontrib><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><description>PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1995</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHDy9HMJDQ4J8nT08YxyDPH091MA8kKdQ0KDXBXc_IMUfD1dXHxcFRz9XBQ8PN09gjyDXRVcwl19fDz93BU8_EODXXkYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWJyal5qSbxXgIeBubGJqbGRozERSgDpsStd</recordid><startdate>19950203</startdate><enddate>19950203</enddate><creator>SUNAMI TAKAYOSHI</creator><scope>EVB</scope></search><sort><creationdate>19950203</creationdate><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><author>SUNAMI TAKAYOSHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0734532A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1995</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>SUNAMI TAKAYOSHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUNAMI TAKAYOSHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE</title><date>1995-02-03</date><risdate>1995</risdate><abstract>PURPOSE:To facilitate construction work by fastening a steel post with a beam in a panel zone with a high split, butting PC beams at the central part, and placing concrete into a system form for an SCR post and a U-shaped form. CONSTITUTION:A PC beam 3 is clamped with structural steel of an SRC post 1. The structural steel of the SRC post 1 is joined with the PC beam 3. Then, a flange and a web of the PC beam are fastened at the central part of the PC beam 3 with a bolt through plates 5 and 5a, thereby lap jointing large beam reinforcing bars 4 with O-type reinforcing bars 4a. Furthermore, concrete is placed in a U-shaped form 12 fixed with bolts 11 installed to the PC beam 3 and a system form 13 to which post reinforcements 7a and hoop reinforcements 7 are placed, thereby joining the SRC post 1 with the PC beam 3 in one piece. It is, therefore, possible to eliminate the need for welding in a panel zone and simplify construction work.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JPH0734532A |
source | esp@cenet |
subjects | BUILDING CEILINGS FIXED CONSTRUCTIONS FLOORS GENERAL BUILDING CONSTRUCTIONS INSULATION OR OTHER PROTECTION OF BUILDINGS ROOFS WALLS, e.g. PARTITIONS |
title | INDUSTRIALIZATION STRUCTURE FOR MIDDLE AND HIGHRISE DWELLING HOUSE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T14%3A33%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUNAMI%20TAKAYOSHI&rft.date=1995-02-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0734532A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |