IN-PLACE LINING PROCESS

PURPOSE:To provide the in-place lining process of tunnel and especially the in-place lining process by which a coating concrete is placed along with propulsion. CONSTITUTION:A concrete contg. the cement composition consisting of 100 pts.wt. of the cement contg. >=60wt.% 3CaO-SiO2, 1-5 pts.wt. of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MORIOKA MINORU, NIKAIDO YASUYUKI, MIHARA TOSHIO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE:To provide the in-place lining process of tunnel and especially the in-place lining process by which a coating concrete is placed along with propulsion. CONSTITUTION:A concrete contg. the cement composition consisting of 100 pts.wt. of the cement contg. >=60wt.% 3CaO-SiO2, 1-5 pts.wt. of anhdrous gypsum, 0.2-3 pts.wt. of aluminum sulfate, expressed in terms of the anhydride, 0.1-0.8 pts.wt. of an alkali metal aluminate and a water reducing agent is placed. The concrete is pressed, cured and then jointed by moving the formwork. As a result, a concrete with the strength developed in the initial stage and capable of excellently maintaining fluidity is obtained, and an efficient in-place lining is effectively conducted.