METHOD OF ASSEMBLING CONSTRUCTION OF ROOF STRUCTURE OF CONNECTING CORRIDOR AND JIG FOR ASSEMBLING ROOF STRUCTURE OF CONNECTING CORRIDOR
PURPOSE:To facilitate the execution of works by installing a jig onto a rail in a retreatable manner, mounting joint members outside a plurality of joint positioning tools set up to the jig and manufacturing a dome having frames using triangles as units. CONSTITUTION:A jig 32 consisting of arched ag...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To facilitate the execution of works by installing a jig onto a rail in a retreatable manner, mounting joint members outside a plurality of joint positioning tools set up to the jig and manufacturing a dome having frames using triangles as units. CONSTITUTION:A jig 32 consisting of arched aggregate 36 and horizontal aggregate 37 is carried and fixed at specified positions on rails 31, and a plurality of joint positioning tools 45 are mounted outside the horizontal aggregate 37 of the jig 32. Joint members J with six blades are set up outside the joint positioning tools 45 while being positioned in space through liners 51. Horizontal members and diagonal members as beam members are installed among the joint members J, a dome having frames using triangles as units is manufactured outside the jig 32, and triangular glass plates are mounted outside the frames. Accordingly, the roof structure of a fast connecting corridor can be assembled accurately. |
---|