ERECTING METHOD FOR STEEL FRAME ROOF USING OUTCABLE STRING BEAM

PURPOSE:To improve the workability and executing efficiency. CONSTITUTION:A truss beam 3 composing a steel frame roof is assembled on a working platform 2 having an assembled jack 1, and jacked down as much as final deflection, and shifted onto supporting rails 5 on a supporting frame 4 extendingly...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ICHINOHE HIDEO, MINOWA TATSUO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE:To improve the workability and executing efficiency. CONSTITUTION:A truss beam 3 composing a steel frame roof is assembled on a working platform 2 having an assembled jack 1, and jacked down as much as final deflection, and shifted onto supporting rails 5 on a supporting frame 4 extendingly provided inside from the working platform 2 and then horizontally drawn. Auxiliary equipment such as a roof finishing material 9 and a crane rail 8 is attached to the above horizontally drawn truss beam 3, and an outcable 10 is also attached to the truss beam 3 and strained. In parallel with the above works, a truss beam 3' on the second place is assembled on the working platform 2, and both the trusses 3, 3 are mutually joined and horizontally drawn, and the above processes are repeated thereafter.