CONSTRUCTING METHOD OF BUILDING WITH AERIAL FRAME BODY
PURPOSE:To fix a principal section to a building ridge with excellent workability regardless of the deformation of the principal section. CONSTITUTION:The principal section 3 of an aerial frame body 2 installed between the building ridges 1 oppositely faced at an interval is prepared on frames 8 mou...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To fix a principal section to a building ridge with excellent workability regardless of the deformation of the principal section. CONSTITUTION:The principal section 3 of an aerial frame body 2 installed between the building ridges 1 oppositely faced at an interval is prepared on frames 8 mounted on a bottom between the building ridges 1, and lifted up to a building level and fastened to the building ridges 1, thus constructing a building with the aerial frame body. Positions, where the aerial frame body 2 is deformed with lifting under the state, in which the principal section is bridged to the building ridges 1, or the state approximating to said state are set at points to be suspended at that time, and only the points to be suspended or sections near to the points in the aerial frame body 2 are placed and born onto the frames 8. The principal section 3 is deformed under the state of installation or the state approximating to said state while the positions of the points to be suspended are adjusted so that the points to be suspended on the building ridge 1 sides are located on vertical lines passing through the points of placing and bearing by the frames 8, and the principal section 3 is lifted up to the building level. |
---|