COMPLEX FRAMED STRUCTURE OF BUILDING
PURPOSE:To obviate a job for concrete placing at a construction site and any welding at a factory and a job site, and improve the transport efficiency in preventing such a possibility that something like a bracket might be projected to the side of a column and reduce working manhours at the site. CO...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To obviate a job for concrete placing at a construction site and any welding at a factory and a job site, and improve the transport efficiency in preventing such a possibility that something like a bracket might be projected to the side of a column and reduce working manhours at the site. CONSTITUTION:At the upper end of a concrete column 1, an end plate 23 of a beam 17 is clamped locked tight so as to hold it between top and bottom by a pair of diaphragms 6 and 7 via a steel rod 12 piercing through the column 1 and the paired diaphragms 6, 7. In addition, both vertical ends of the end plate 23 are engaged with two grooves 10 and 10 of the paired diaphragms 6 and 7. |
---|