TUNNELING METHOD
PURPOSE:To reduce the cost of construction by inserting a heat pipe into natural ground, turning to the circumferential portion of a tunnel to be excavated, and freezing the natural ground with an evaporator element of the pipe via a coolant colled up by a refrigerating plant. CONSTITUTION:A heat pi...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To reduce the cost of construction by inserting a heat pipe into natural ground, turning to the circumferential portion of a tunnel to be excavated, and freezing the natural ground with an evaporator element of the pipe via a coolant colled up by a refrigerating plant. CONSTITUTION:A heat pipe 1 is inserted into natural ground, turning to a circumferential part 24 of a tunnel 22 to be excavated, and a condenser 8 of this pipe 1 is cooled by a refrigerating plant 15, with a coolant cooled via a jacket 17. In addition, the natural ground, turning to the circumferential portion 24 of the tunnel 22 to be excavated is frozen into a cryogenic level in a quick manner, excavating the tunnel 22. With this constitution, a construction period is reducible in addition to reduction in construction cost. |
---|