BUILDING METHOD FOR BUILDING

PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ITAYA TOSHIRO, MASAKI KAZUO, ARAMAKI TETSUO, YOSHIHARA CHOKICHI, AIHARA KAZUO, SHINOZAKI TORU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ITAYA TOSHIRO
MASAKI KAZUO
ARAMAKI TETSUO
YOSHIHARA CHOKICHI
AIHARA KAZUO
SHINOZAKI TORU
description PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of construction of a building body. CONSTITUTION:A guide pillar is standingly provided on the center part of the ground M where a building is built. Next, an erection roof 2 is slidably fitted along the guide pillar 1, and the ground M is drilled to build the floor slab of the first floor. Next, in the erection roof 2, a steelwork truss 7 is provided radially and extendedly on the slide device 6 of the guide pillar 1. The ground M is successively drilled, and a tower crane 8 is equipped on the upper part of the erection roof 2. An underground building body (b) is built up to the lower-most part and a building on the ground (a) is assembled, hence the building is bud, and after completing all the building the erection roof 2 and the tower crane 8 are disassembled.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH04323467A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH04323467A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH04323467A3</originalsourceid><addsrcrecordid>eNrjZJBxCvX0cfH0c1fwdQ3x8HdRcPMPUoCJ8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeK8ADwMTYyNjEzNzR2Ni1AAAatYg4w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BUILDING METHOD FOR BUILDING</title><source>esp@cenet</source><creator>ITAYA TOSHIRO ; MASAKI KAZUO ; ARAMAKI TETSUO ; YOSHIHARA CHOKICHI ; AIHARA KAZUO ; SHINOZAKI TORU</creator><creatorcontrib>ITAYA TOSHIRO ; MASAKI KAZUO ; ARAMAKI TETSUO ; YOSHIHARA CHOKICHI ; AIHARA KAZUO ; SHINOZAKI TORU</creatorcontrib><description>PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of construction of a building body. CONSTITUTION:A guide pillar is standingly provided on the center part of the ground M where a building is built. Next, an erection roof 2 is slidably fitted along the guide pillar 1, and the ground M is drilled to build the floor slab of the first floor. Next, in the erection roof 2, a steelwork truss 7 is provided radially and extendedly on the slide device 6 of the guide pillar 1. The ground M is successively drilled, and a tower crane 8 is equipped on the upper part of the erection roof 2. An underground building body (b) is built up to the lower-most part and a building on the ground (a) is assembled, hence the building is bud, and after completing all the building the erection roof 2 and the tower crane 8 are disassembled.</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>1992</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19921112&amp;DB=EPODOC&amp;CC=JP&amp;NR=H04323467A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19921112&amp;DB=EPODOC&amp;CC=JP&amp;NR=H04323467A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ITAYA TOSHIRO</creatorcontrib><creatorcontrib>MASAKI KAZUO</creatorcontrib><creatorcontrib>ARAMAKI TETSUO</creatorcontrib><creatorcontrib>YOSHIHARA CHOKICHI</creatorcontrib><creatorcontrib>AIHARA KAZUO</creatorcontrib><creatorcontrib>SHINOZAKI TORU</creatorcontrib><title>BUILDING METHOD FOR BUILDING</title><description>PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of construction of a building body. CONSTITUTION:A guide pillar is standingly provided on the center part of the ground M where a building is built. Next, an erection roof 2 is slidably fitted along the guide pillar 1, and the ground M is drilled to build the floor slab of the first floor. Next, in the erection roof 2, a steelwork truss 7 is provided radially and extendedly on the slide device 6 of the guide pillar 1. The ground M is successively drilled, and a tower crane 8 is equipped on the upper part of the erection roof 2. An underground building body (b) is built up to the lower-most part and a building on the ground (a) is assembled, hence the building is bud, and after completing all the building the erection roof 2 and the tower crane 8 are disassembled.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1992</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJBxCvX0cfH0c1fwdQ3x8HdRcPMPUoCJ8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeK8ADwMTYyNjEzNzR2Ni1AAAatYg4w</recordid><startdate>19921112</startdate><enddate>19921112</enddate><creator>ITAYA TOSHIRO</creator><creator>MASAKI KAZUO</creator><creator>ARAMAKI TETSUO</creator><creator>YOSHIHARA CHOKICHI</creator><creator>AIHARA KAZUO</creator><creator>SHINOZAKI TORU</creator><scope>EVB</scope></search><sort><creationdate>19921112</creationdate><title>BUILDING METHOD FOR BUILDING</title><author>ITAYA TOSHIRO ; MASAKI KAZUO ; ARAMAKI TETSUO ; YOSHIHARA CHOKICHI ; AIHARA KAZUO ; SHINOZAKI TORU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH04323467A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1992</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ITAYA TOSHIRO</creatorcontrib><creatorcontrib>MASAKI KAZUO</creatorcontrib><creatorcontrib>ARAMAKI TETSUO</creatorcontrib><creatorcontrib>YOSHIHARA CHOKICHI</creatorcontrib><creatorcontrib>AIHARA KAZUO</creatorcontrib><creatorcontrib>SHINOZAKI TORU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ITAYA TOSHIRO</au><au>MASAKI KAZUO</au><au>ARAMAKI TETSUO</au><au>YOSHIHARA CHOKICHI</au><au>AIHARA KAZUO</au><au>SHINOZAKI TORU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BUILDING METHOD FOR BUILDING</title><date>1992-11-12</date><risdate>1992</risdate><abstract>PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of construction of a building body. CONSTITUTION:A guide pillar is standingly provided on the center part of the ground M where a building is built. Next, an erection roof 2 is slidably fitted along the guide pillar 1, and the ground M is drilled to build the floor slab of the first floor. Next, in the erection roof 2, a steelwork truss 7 is provided radially and extendedly on the slide device 6 of the guide pillar 1. The ground M is successively drilled, and a tower crane 8 is equipped on the upper part of the erection roof 2. An underground building body (b) is built up to the lower-most part and a building on the ground (a) is assembled, hence the building is bud, and after completing all the building the erection roof 2 and the tower crane 8 are disassembled.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH04323467A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
WALLS, e.g. PARTITIONS
title BUILDING METHOD FOR BUILDING
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T03%3A27%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ITAYA%20TOSHIRO&rft.date=1992-11-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH04323467A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true