BUILDING METHOD FOR BUILDING

PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ITAYA TOSHIRO, MASAKI KAZUO, ARAMAKI TETSUO, YOSHIHARA CHOKICHI, AIHARA KAZUO, SHINOZAKI TORU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PURPOSE:To shorten construction period by standingly providing a guide pillar on the center part of the ground where a building is built, slidably providing an erection roof having the size covering the building along the guide pillar, and thrusting up the erection roof accompanied with progress of construction of a building body. CONSTITUTION:A guide pillar is standingly provided on the center part of the ground M where a building is built. Next, an erection roof 2 is slidably fitted along the guide pillar 1, and the ground M is drilled to build the floor slab of the first floor. Next, in the erection roof 2, a steelwork truss 7 is provided radially and extendedly on the slide device 6 of the guide pillar 1. The ground M is successively drilled, and a tower crane 8 is equipped on the upper part of the erection roof 2. An underground building body (b) is built up to the lower-most part and a building on the ground (a) is assembled, hence the building is bud, and after completing all the building the erection roof 2 and the tower crane 8 are disassembled.