GABLE PANEL CARRIER HOIST LINE IN PRODUCTION PROCESS OF HOUSING UNIT

PURPOSE:To improve productivity by providing a reciprocating rail with which a panel is moved from the arrangement position of a gable panel carrier conveyer to an assembly point, on a ceiling rail, and by arranging a plurality of hoists on the reciprocating rail, so as to carry out sending work of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: FUKUZAWA YOSHIYUKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FUKUZAWA YOSHIYUKI
description PURPOSE:To improve productivity by providing a reciprocating rail with which a panel is moved from the arrangement position of a gable panel carrier conveyer to an assembly point, on a ceiling rail, and by arranging a plurality of hoists on the reciprocating rail, so as to carry out sending work of gable panel in the middle of assembly work. CONSTITUTION:A fourth ceiling rail 34 is provided between an arrangement point B of a carrier conveyer 25 of gable panels 3, 4, and an assembly point A of a housing unit 5, and the ceiling rail 34 is composed of seven rails 35-41. The gable panels 3, 4 are lifted by hoists 42, 43 respectively, and are carried from one of going rails 35-38 correspondent to the size of a unit 5 to the assembly point A on supporting boards 48, 49, in the vertical position. The panels are put on the supporting boards 48, 49 at proper width position, and are assembled along with a ceiling panel 1, and a floor panel 2. After the panels are put on, hoists 42-46 separated from the gable panels 3, 4, are returned from returning rails 39, 40 to the arrangement point B, and next gable panels 3, 4 are lifted and are sent to the assembly point A.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH04201033A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH04201033A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH04201033A3</originalsourceid><addsrcrecordid>eNrjZHBxd3TycVUIcPRz9VFwdgwK8nQNUvDw9wwOUfDx9HNV8PRTCAjydwl1DvH0BzOdXYODFfzdgGpCgz393BVC_TxDeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvFeAh4GJkYGhgbGxozExagBBWSu4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>GABLE PANEL CARRIER HOIST LINE IN PRODUCTION PROCESS OF HOUSING UNIT</title><source>esp@cenet</source><creator>FUKUZAWA YOSHIYUKI</creator><creatorcontrib>FUKUZAWA YOSHIYUKI</creatorcontrib><description>PURPOSE:To improve productivity by providing a reciprocating rail with which a panel is moved from the arrangement position of a gable panel carrier conveyer to an assembly point, on a ceiling rail, and by arranging a plurality of hoists on the reciprocating rail, so as to carry out sending work of gable panel in the middle of assembly work. CONSTITUTION:A fourth ceiling rail 34 is provided between an arrangement point B of a carrier conveyer 25 of gable panels 3, 4, and an assembly point A of a housing unit 5, and the ceiling rail 34 is composed of seven rails 35-41. The gable panels 3, 4 are lifted by hoists 42, 43 respectively, and are carried from one of going rails 35-38 correspondent to the size of a unit 5 to the assembly point A on supporting boards 48, 49, in the vertical position. The panels are put on the supporting boards 48, 49 at proper width position, and are assembled along with a ceiling panel 1, and a floor panel 2. After the panels are put on, hoists 42-46 separated from the gable panels 3, 4, are returned from returning rails 39, 40 to the arrangement point B, and next gable panels 3, 4 are lifted and are sent to the assembly point A.</description><language>eng</language><subject>BUILDING ; CEILINGS ; COMBINED OPERATIONS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; MACHINE TOOLS ; METAL-WORKING NOT OTHERWISE PROVIDED FOR ; OTHER WORKING OF METAL ; PERFORMING OPERATIONS ; ROOFS ; TRANSPORTING ; UNIVERSAL MACHINE TOOLS ; WALLS, e.g. PARTITIONS</subject><creationdate>1992</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19920722&amp;DB=EPODOC&amp;CC=JP&amp;NR=H04201033A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19920722&amp;DB=EPODOC&amp;CC=JP&amp;NR=H04201033A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FUKUZAWA YOSHIYUKI</creatorcontrib><title>GABLE PANEL CARRIER HOIST LINE IN PRODUCTION PROCESS OF HOUSING UNIT</title><description>PURPOSE:To improve productivity by providing a reciprocating rail with which a panel is moved from the arrangement position of a gable panel carrier conveyer to an assembly point, on a ceiling rail, and by arranging a plurality of hoists on the reciprocating rail, so as to carry out sending work of gable panel in the middle of assembly work. CONSTITUTION:A fourth ceiling rail 34 is provided between an arrangement point B of a carrier conveyer 25 of gable panels 3, 4, and an assembly point A of a housing unit 5, and the ceiling rail 34 is composed of seven rails 35-41. The gable panels 3, 4 are lifted by hoists 42, 43 respectively, and are carried from one of going rails 35-38 correspondent to the size of a unit 5 to the assembly point A on supporting boards 48, 49, in the vertical position. The panels are put on the supporting boards 48, 49 at proper width position, and are assembled along with a ceiling panel 1, and a floor panel 2. After the panels are put on, hoists 42-46 separated from the gable panels 3, 4, are returned from returning rails 39, 40 to the arrangement point B, and next gable panels 3, 4 are lifted and are sent to the assembly point A.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>COMBINED OPERATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>MACHINE TOOLS</subject><subject>METAL-WORKING NOT OTHERWISE PROVIDED FOR</subject><subject>OTHER WORKING OF METAL</subject><subject>PERFORMING OPERATIONS</subject><subject>ROOFS</subject><subject>TRANSPORTING</subject><subject>UNIVERSAL MACHINE TOOLS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1992</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHBxd3TycVUIcPRz9VFwdgwK8nQNUvDw9wwOUfDx9HNV8PRTCAjydwl1DvH0BzOdXYODFfzdgGpCgz393BVC_TxDeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvFeAh4GJkYGhgbGxozExagBBWSu4</recordid><startdate>19920722</startdate><enddate>19920722</enddate><creator>FUKUZAWA YOSHIYUKI</creator><scope>EVB</scope></search><sort><creationdate>19920722</creationdate><title>GABLE PANEL CARRIER HOIST LINE IN PRODUCTION PROCESS OF HOUSING UNIT</title><author>FUKUZAWA YOSHIYUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH04201033A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1992</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>COMBINED OPERATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>MACHINE TOOLS</topic><topic>METAL-WORKING NOT OTHERWISE PROVIDED FOR</topic><topic>OTHER WORKING OF METAL</topic><topic>PERFORMING OPERATIONS</topic><topic>ROOFS</topic><topic>TRANSPORTING</topic><topic>UNIVERSAL MACHINE TOOLS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>FUKUZAWA YOSHIYUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FUKUZAWA YOSHIYUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>GABLE PANEL CARRIER HOIST LINE IN PRODUCTION PROCESS OF HOUSING UNIT</title><date>1992-07-22</date><risdate>1992</risdate><abstract>PURPOSE:To improve productivity by providing a reciprocating rail with which a panel is moved from the arrangement position of a gable panel carrier conveyer to an assembly point, on a ceiling rail, and by arranging a plurality of hoists on the reciprocating rail, so as to carry out sending work of gable panel in the middle of assembly work. CONSTITUTION:A fourth ceiling rail 34 is provided between an arrangement point B of a carrier conveyer 25 of gable panels 3, 4, and an assembly point A of a housing unit 5, and the ceiling rail 34 is composed of seven rails 35-41. The gable panels 3, 4 are lifted by hoists 42, 43 respectively, and are carried from one of going rails 35-38 correspondent to the size of a unit 5 to the assembly point A on supporting boards 48, 49, in the vertical position. The panels are put on the supporting boards 48, 49 at proper width position, and are assembled along with a ceiling panel 1, and a floor panel 2. After the panels are put on, hoists 42-46 separated from the gable panels 3, 4, are returned from returning rails 39, 40 to the arrangement point B, and next gable panels 3, 4 are lifted and are sent to the assembly point A.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH04201033A
source esp@cenet
subjects BUILDING
CEILINGS
COMBINED OPERATIONS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
MACHINE TOOLS
METAL-WORKING NOT OTHERWISE PROVIDED FOR
OTHER WORKING OF METAL
PERFORMING OPERATIONS
ROOFS
TRANSPORTING
UNIVERSAL MACHINE TOOLS
WALLS, e.g. PARTITIONS
title GABLE PANEL CARRIER HOIST LINE IN PRODUCTION PROCESS OF HOUSING UNIT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T01%3A00%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FUKUZAWA%20YOSHIYUKI&rft.date=1992-07-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH04201033A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true