CONSTRUCTION OF NEW BUILDING CAPABLE OF OPERATING EXISTING STRUCTURE

PURPOSE:To improve the extent of operation efficiency by installing a temporary beam in a temporary support pile at a position where it is shifted as far as the specified value from a permanent column member setup position and, after constructing a foundation pile and a permanent column, moving the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: YASUMOTO MASATAKE
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!