CONSTRUCTION OF NEW BUILDING CAPABLE OF OPERATING EXISTING STRUCTURE
PURPOSE:To improve the extent of operation efficiency by installing a temporary beam in a temporary support pile at a position where it is shifted as far as the specified value from a permanent column member setup position and, after constructing a foundation pile and a permanent column, moving the...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!