TUNNEL CONSTRUCTION METHOD
PURPOSE:To prevent the substantial consumption increase of mortar and avoid a cost increase by mixing foamed synthetic resin particles with the mortar before forced supply when the mortar is forcibly supplied through the executed portion of a tunnel for back-filling at the outside of a shielding mat...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To prevent the substantial consumption increase of mortar and avoid a cost increase by mixing foamed synthetic resin particles with the mortar before forced supply when the mortar is forcibly supplied through the executed portion of a tunnel for back-filling at the outside of a shielding material. CONSTITUTION:A bonding agent of synthetic polymer emulsion type is preliminarily added to water to be kneaded with cement and the like in a mortar mixer 15. Then, after a water solution containing a small amount of a surface active agent is preliminarily deposited on foamed synthetic resin particles, cement is kept in contact with the aforesaid particles and a cement film is deposited and formed on the surface of the particles. As a result, affinity between the foamed synthetic resin particles and the mortar increases and a difference in specific weight thereof decreases, enabling an easy kneading process to be applied. On the other hand, a tank 20 is supplied with the foamed synthetic resin particles from 1 foaming machine 45 via a pump 46. Also, the foaming machine 45 contains a solution of synthetic resin and is capable of manufacturing the foamed synthetic resin particles from the solution whenever necessary. |
---|